Can you provide answers for two quizzes? below is the first: QUESTION 1 If all sample averages on an -chart fall within the control limits, all output will be conforming. True False 4 points QUESTION 2 Process control and process capability are synonymous terms. True False 4 points QUESTION 3 When monitoring attribute data using a p-chart, if the subgroup size is not constant, variable control limits can be established. True False 4 points QUESTION 4 If the mean contaminant count per squared millimeter is 5.8, then the center line for a c-chart that plots the contaminant count per squared centimeter is 580. True False 4 points QUESTION 5 When constructing control limits, if special causes are found, they are eliminated and the control limits recomputed because the special cause points do not represent a state of statistical control. True False 4 points QUESTION 6 The s-chart is used to monitor variation. True False 4 points QUESTION 7 An s-chart utilizes the range instead of the standard deviation utilized in R-charts. True False 4 points QUESTION 8 Control charts for individual variables data require calculation of a moving range. True False 4 points QUESTION 9 Subgroup samples should be chosen so that, if assignable causes are present, the chance of observing differences between samples is low, while the chance of observing differences within a sample is high. True False 4 points QUESTION 10 For variables data, sample size can be calculated by specifying the desired minimum shift in the process mean to be detected. True False 4 points QUESTION 11 A process is deemed ?out of control? when common causes are present. special causes are present. data varies around the mean. defective rate is high. 4 points QUESTION 12 _____________ developed the first control charts. G. Taguchi Walter Shewhart W. Edwards Deming Dr. Joseph Moses Juran 4 points QUESTION 13 A manufacturing company producing circuit boards will randomly sample 60 circuit boards per day and record the number of defects contained in each of these boards. Management wants to plot the number of defects in all the circuit boards sampled. What control chart is most appropriate? -chart p-chart np-chart c-chart 4 points QUESTION 14 A delivery company defines a ?defective? as a package delivered later than the promised delivery time. Management wants to monitor the proportion of packages delivered per week beyond the promised delivery time. Management is willing to sample 150 packages per week and determine which of these packages are ?defective.? What control chart is most appropriate? -chart R-chart p-chart c-chart 4 points QUESTION 15 Determine the sample standard deviation for the following sample data: 7, 9, 2, 0, 1 and 5. 3.3466 3.2660 2.9933 3.5777 4 points QUESTION 16 Suppose that a substrate is built from layers so that its thickness is the sum of the thicknesses of each layer. The thickness of each layer has the following means and standard deviations. What is the probability that the substrate thickness exceeds 110 units? Layer, Mean, Standard deviation 1, 20, 4 2, 30, 8 3, 50, 10 0.325 0.227 0.478 0.536 4 points QUESTION 17 In the application of an xbar control chart with the usual 3-sigma limits, if the subgroup sample size is increased the Type I errors decrease, and the Type II errors increase. the Type I errors remain the same and the Type II errors increase. the Type I errors remain the same and the Type II errors decrease. both the Type I and Type II errors decrease. 4 points QUESTION 18 For an xbar and R control chart use the following summary statistics: = 10.0, =2.3, and n=4 to answer the following questions. (Note: Use the above scenario and data to answer questions 18-20.) Calculate an unbiased estimate of . 2.4965 1.117 2.039 2.883 4 points QUESTION 19 (Use scenario from question 18 above.) Calculate the upper control limit for an xbar control chart. 16.9 13.35 14.234 11.677 4 points QUESTION 20 (Use scenario from question 18 above.) Calculate the upp